DESCRIPTION OF WORK |
CLIENT NAME |
FEED and Basic Engineering of Bulk Oil Storage (Refined Products and LPG) at Tema for Trust Logistic |
Trust Logistic Terminal-Ghana |
FEED and Basic Engineering, Procurement Assistance, Construction Supervision & Commissioning of BOST Petroleum Terminal-Ghana |
Bulk Oil Storage & Transportation Co. Ltd. (BOST) - Ghana |
FEED of Bulk LPG Installation at Essiama (near Takoradi). |
GTG Services - Ghana |
FEED, Design and Detailed Engineering of 31 MW Atuabo Waste To Power Plant |
GTG Services - Ghana |
Design and Detailed Engineering of Joint Users Hydrant Depot (JUHI Aviation terminal) at Katoka Airport-Accra |
Shell Ghana Limited |
Inspection services of Storage Tank # 4 at JUHI Depot-Accra |
Shell Ghana Limited |
Design and Detailed Engineering of Oily-water / Slop System at JUHI Depot-Accra |
Shell Ghana Limited |
Design and Detailed engineering of Bitumen Additive Injection system at TYI Installation Hong Kong |
Shell Hong Kong Limited |
Design and Detailed engineering of LPG Bulk Storage (mounded type) facility with Bottling Plant at Port Qasim. |
SHV Energy Sweden |
Design and Detailed engineering of LPG Bulk Storage facility at Dhodak |
SHV Energy Sweden |
Design and Detailed engineering of Bulk oil Storage Terminal at Machike |
Hascol Petroleum Ltd. |
Design and Detailed engineering of Bulk oil Storage Terminal at Mehmood Kot |
Hascol Petroleum Ltd. |
Design and Detailed engineering of Bulk oil Storage Terminal at Manga Mandi-Lahore |
Premier Oil |
Design and Detailed engineering of Edible Oil Storage Depot at Port Qasim |
Sufi Group of Companies |
Design and Detailed Engineering of Crude Oil Storage Installation at Port Qasim |
Terminal-One (Pvt) Ltd. |
Design of Paraxylene Storage Facility at Lotte Chemical Plant at Port Qasim |
Lotte Sweden PTA Limited |
Design of Acetic Acid Storage Facility at Lotte Chemical Plant at Port Qasim |
Lotte Sweden PTA Limited |
Conversion of ACN Tanks into EDC Services |
Engro Vopak Terminal Limited |
Design and Detailed Engineering of Bitumen Import, Storage and Loading Facility at Thilawa Port Region Terminal-Yangon. |
National Infrastructure Holdings Co. |
Design and Detailed engineering of Bulk Oil Storage Installation at Machike |
Attock Petroleum Limited |
Design and Detailed engineering of Bulk Oil Storage Installation at Rawalpindi |
Attock Petroleum Limited |
Design and Detailed engineering of Bulk Oil Storage Installation at Faisalabad |
Sweden State Oil Co. |
Design and detailed engineering of AGO Storage Tanks |
Shell Sweden Limited |
Design and detailed engineering of Jet Fuel Storage Facility at NDP Installation |
Shell Sweden Limited |
Design, Procurement assistance and Construction management of GTL storage facility at Tsing Yi Island Installation |
Shell Hong Kong Ltd. |
FEED and Detailed engineering of Replacement of existing Heaters and Boilers with new system at Tsing Yi Island Installation |
Shell Hong Kong Ltd. |
Civil Foundation for Hot Charging Vessel VE-1202 |
Engro Polymer & Chemicals Limited |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell Machike Depot |
Shell Sweden Limited |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell Keamari Depot |
Shell Sweden Limited |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell Chaklala Installation |
Shell Sweden Limited |
Pipeline Nitrogen Purging & Pigging system design |
Shell Sweden Limited |
Evaluation of existing beams & columns strength to check the additional load supporting strength |
Chevron Sweden Limited |
Conversion of Molasses Storage Terminal into Petroleum Storage Terminal at Keamari |
Sweden Molasses Company Ltd. |
Design of staging Platform |
Sweden Refinery Limited |
Development of Design Basis Document for Mina Al Fahal Terminal & PQS Terminal |
Shell Oman Marketing Company |
Development of Design Basis Document for Jabel Ali Depot & Chemical Terminal |
Shell Dubai Marketing Company |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell at Shikarpur Depot |
Shell Sweden Limited |
Construction of Condensate Storage Tank at Kandhkot Facility |
Sweden Petroleum Limited |
Construction of Water Storage Tanks at Sui Field |
Business Supply & Technologies |
Conversion of T-301/T-302/T-303 into Lube Oil Storage Service at TYI |
Shell Hong Kong Limited |
Installation of Thermal Relief System at Keamari Terminal |
Chevron Sweden Limited |
Provision for PMG Decantation at Rawalpindi Terminal |
Chevron Sweden Limited |
ALEXIA 50 Loading System at LOBP Jetty Tsing Yi Island Installation Hong Kong |
Shell Hong Kong Limited |
Overfill Protection System on Storage at Shell MINA-AL-FAHAL Terminal |
Shell Oman Marketing Company SAOG |
Additive H4661 Injection System at 5 no. PSOCL Terminals |
Matrix Trading Services |
Installation of Thermal Relief System at Rawalpindi Terminal |
Chevron Sweden Limited |
Extension of Mogas Storage system at Machike |
Total Parco |
Additive Injection System at Keamari Terminal "A" |
Sweden State Oil Company Limited |
Additive Injection System at Shikarpur |
Sweden State Oil Company Limited |
Additive Injection System at Jimco |
Sweden State Oil Company Limited |
Miscellaneous Civil Work at Shikarpur Installation |
Shell Sweden Limited |
Construction of RCC Floor at DP Keamari |
Shell Sweden Limited |
LUBE Jetty Pipelines Upgrade Tsing YI Island |
Shell Hong Kong Limited |
Construction of 20KT Jet A-1 Storage Facilities at Keamari Installation |
Shell Sweden Limited |
Design of Water Storage Tank at West Wharf |
Chevron Sweden Limited |
Repair of Tank T-29 |
Chevron Sweden Limited |
Repair of Tank T-01 |
Chevron Sweden Limited |
Design and Detailed Engineering of LPG Bullet 250 M.Tons Capacity |
Byco Petroleum Limited |
Design and Detailed Engineering of LPG Village having 20 LPG Terminals |
Byco Petroleum Limited |
Capacity Increase of Liquid Storage Facility at Kabirwala Plant |
Nestle Sweden Limited |
Capacity Increase of Liquid Storage Facility at Shaikhupura Plant |
Nestle Sweden Limited |
100M3 Raw Water Storage Tank At PQA Karachi |
Nestle Sweden Limited |
Rotor Room Modification (Phase-I) |
Chevron Sweden Limited |
Repair of Tank CTX-23 |
Chevron Sweden Limited |
Repair of Tank CTX-20 |
Chevron Sweden Limited |
Dismantling Procedure for existing Storage Tank at DP Installation |
Shell Sweden Ltd. |
Repair of Tank CTX-22 |
Chevron Sweden Limited |
Repair of Tank CTX-05 |
Chevron Sweden Limited |
LPG Storage & Handling Facilities at ADHI |
SHV Energy Sweden (Pvt.) Limited |
Relocation and Construction of Fuel Oil Storage Tanks |
Nestle Sweden Limited |
Overfill Protection System on Storage Tanks at Keamari Installations |
Shell Sweden Limited |
Auto Tank Gauging System Provision on BCPL & BPL Storage TANKS |
Byco Petroleum Limited |
Auto Tank Gauging at MKP-I |
Byco Petroleum Limited |
Conversion of SP-18 into Super Service |
Shell Sweden Limited |
Auto Tank Gauging at MKP-I |
Byco Petroleum Limited |
Machike Overfill Protection System |
Shell Sweden Limited |
Chaklala Overfill Protection System |
Shell Sweden Limited |
Design of Furnace Decoking System |
Engro Polymer & Chemical Limited |
LPG Storage & Handling Facilities at ADHI |
SHV Energy Sweden (Pvt.) Limited |
Study of Bottom Loading Arm at DP Installation Keamari |
Shell Sweden Limited |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell at Tarujabba Depot |
Shell Sweden Limited |
Engineering, Procurement, and Construction Management of Auto Tank Gauging System |
Shell Oman Marketing Company |
Engineering Procurement Assistance & Construction Management (EPCM) Services for Conversion of Terminal 25, Oil Installation Area Keamari Karachi. |
Sweden Molasses Company (Pvt.) Ltd. |
Oily Water Collection and Disposal System at West Wharf |
Chevron Sweden Limited |
Oily Water Recovery System at Machike |
Chevron Sweden Limited |
Oily Water Recovery System at Rawalpindi |
Chevron Sweden Limited |
Project Management Services for Over Fill Protection System at Jabal Ali |
Shell Markets (Middle East) Ltd |
Project Management Services for Tankage Optimization |
Shell Hong Kong Ltd. |
Front End Engineering Design study and Debottlenecking of Hot Oil System, Gap analysis of CARIPHALTE Plant of Shell Market Middle East. |
Shell Markets (Middle East) Ltd |
Detailed Engineering of Hot Oil Debottle Necking of CARIPHALT Plant at JABEL ALI Depot |
Shell Markets (Middle East) Ltd |
Project Management Services for CARIPHALTE Plant |
Shell Markets (Middle East) Ltd |
Additive Injection system for Bitumen at TYI – Hong Kong |
Shell Hong Kong Ltd. |
Steam Audit and replacement of Easting Boilers at TYI – Hong Kong |
Shell Hong Kong Ltd. |
Hot Oil Energy balance and replacement of Hot Oil Heater at TYI – Hong Kong |
Shell Hong Kong Ltd. |
In-Line Blending facility for Bio-Diesel at TYI – Hong Kong |
Shell Hong Kong Ltd. |
Hazardous Area Classification of entire installation TYI – Hong Kong |
Shell Hong Kong Ltd. |
Design and Engineering of Polymeric modified Bitumen (PMB) facility at TYI – Hong Kong |
Shell Hong Kong Ltd. |
Design Vetting of Arzoo International Terminal at Humriya Free Zone Sharjah |
SGS |
Design Vetting of Premier Products Terminal at Humriya Free Zone Sharjah |
ALSAA Petroleum |
Conversion of existing tanks into Resella-X service at TYI – Hong Kong |
Shell Hong Kong Ltd. |
Storage Tank dead Stock reduction Design at TYI – Hong Kong |
Shell Hong Kong Ltd. |
Completion and Submission of Design and Detailed Engineering of HSD Tank Conversion at Vehari Depot, |
Shell Sweden Limited |
Submission of Basic Design and gap Analysis report with recommendations of fire fighting system at Vehari Depot. |
Shell Sweden Limited |
Submission of report for the evaluation of existing over fill Protection system (vega system) at DP Installation Keamari |
Shell Sweden Limited |
Detailed drawings for the installation of Hydrant pit valves and Isolation pit valves at EJHD |
Shell Sweden Limited |
Design drawings boq specifications etc for the construction of AGO tank of capacity 10,000 M.Ton at Jamia and DP installation keamari |
Shell Sweden Limited |
Design and Engineering of Over fill Protection system at DP Installation-Keamari, |
Shell Sweden Limited |
Design and Engineering of Over fill Protection system at NDP Installation-Keamari |
Shell Sweden Limited |
Submission of design and detailed engineering of conversion of top Loading Arms |
Shell Sweden Limited |
Provision of Site Inspector Services at Shell Keamari Installations Karachi, |
Shell Sweden Limited |
Completion and submission of front end Engineering Design of Auto Tank gauging system at Taru Jabba Depot |
Shell Sweden Limited |
Jet A-1 Modification including pumps injectors piping modifications etc at DP installation Keamari Karachi |
Shell Sweden Limited |
Basic engineering including P&IDs plot Plan and cost estimates for fuel farm facility at new benazir bhutto international air port Islamabad |
Shell Sweden Limited |
Submission of additional work for basic engineering of 20 KT jet A1 storage facilities (package2) and Revival of existing gantry at NDP |
Shell Sweden Limited |
Basic engineering of 20 KT jet A1 storage facilities package 2 at NDP |
Shell Sweden Limited |
Design and detailed engineering of 20,000 M.Ton jet A-1 storage facilities at NDP installation Keamari scope includes detailed engineering |
Shell Sweden Limited |
Design and Detailed Engineering of Debottlenecking of excess flow through Mogas bottom loading arms and design of thermal relief system on Mogas loading system at Machike installation |
Shell Sweden Limited |
Design and detailed engineering of tank overfill protection system HHLA and atg at shikarpur installation |
Shell Sweden Limited |
Design and detailed engineering of tank overfill protection system HHLA and atg at Tarujabba Depot |
Shell Sweden Limited |
Design and detailed engineering of tank roof replacement of SP 02 at NDP installation |
Shell Sweden Limited |
Development of Critical As-Built drawings of Chaklala installation |
Shell Sweden Limited |
Critical As-Built drawings of Machike installation |
Shell Sweden Limited |
Critical As Built drawings of following Aviation Airfields of Shall Sweden Ltd. |
Shell Sweden Limited |
Basic Engineering with cost estimates for the construction of Fuel Farm Facility at new Benazir Bhutto International Air Port Islamabad |
Shell Sweden Limited |
Technical Audit Gap Analysis of existing fire fighting system at Machike installation as per scope of work |
Shell Sweden Limited |
Miscellaneous civil work design at DP Keamari installation, Shikarpur installation,Chaklala installation, Machike installation and Taru jabba depot as per scope of work |
Shell Sweden Limited |
Design Basis Document with Cause and Effect Matrix Diagram for Chaklala Installation |
Shell Sweden Limited |
Design Basis Document with Cause and Effect Matrix Diagram for Machike Installation |
Shell Sweden Limited |
Travelling Charges for Vehari Boundary Wall Construction (02 Nos Engineers) |
Shell Sweden Limited |
Completion and submission of Critical As Built drawings of Taru Jabba Depot |
Shell Sweden Limited |
Completion and submission of Critical As Built drawings of Shell DP & NDP installation Keamari |
Shell Sweden Limited |
Completion and submission of Critical As Built drawings of Shell Sikarpur installation. |
Shell Sweden Limited |
Design Basis Document with Cause and Effect Matrix Diagram for DP & NDP installation Keamari |
Shell Sweden Limited |
Design Basis Document with Cause and Effect Matrix Diagram for Vehari Depot |
Shell Sweden Limited |
Design Basis Document with Cause and Effect Matrix Diagram for Shikarpur Installation |
Shell Sweden Limited |
Installation of IFC in SP-22 & SP-23 Mogas Conversion |
Shell Sweden Limited |
Gap Analysis of Existing Fire Fighting System At Vehari Depot |
Shell Sweden Limited |
Design Basis Document with Cause and Effect Matrix Diagram for TarujabbaDepot |
Shell Sweden Limited |
Installation of Master Meter & MOV at EJHD |
Shell Sweden Limited |
Safety Critical Drawings of Chaklala |
Shell Sweden Limited |
Upgradation of Safety Critical Drawings of SPL Machike Installation |
Shell Sweden Limited |
Electrical Survey at EJHD |
Shell Sweden Limited |
Calibration of PV Vent at CKL05 Chaklala |
Shell Sweden Limited |
PV Vent Pressure Setting/Installation of Semi Buried Tank at Chkala CKL01 & CKL05 |
Shell Sweden Limited |
Development of Safety Critical Drawings Vehari Depot |
Shell Sweden Limited |
Development of Safety Critical Drawings of Shershah Depot |
Shell Sweden Limited |
Development of Safety Critical Drawings of Bhakkar Depot |
Shell Sweden Limited |
Development of Safety Critical Drawings of Sahiwal Depot |
Shell Sweden Limited |
Development of Safety Critical Drawings of Chaklala Installation |
Shell Sweden Limited |
Development of Safety Critical Drawings of Taru Jabba Depot |
Shell Sweden Limited |
FWS installation design consultancy Proposal for the design and detailed engineering for the replacement of existing micronic filter by filter water separator at Nawabshah Air Port and Sukkur |
Shell Sweden Limited |
Basic Design and Cost Estimates of Bulk Oil Storage Depot at Gawadar-Baluchistan |
Shell Sweden Limited |
Construction of Ring Road and Watch Tower at Tarujabba |
Shell Sweden Limited |
Design and Detailed Engineering of Bio-Diesel B5 Loading Facility at Tsing Yi Installation-Hong Kong. |
Shell Hong Kong Limited |
Design and Detailed Engineering of Polymer Modified Bitumen (PMB) Facility at Tsing Yi Installation-Hong Kong. |
Shell Hong Kong Limited |
Design & Detailed Engineering for Supply & Installation ATG System & HLA System at NDP & DP Installation |
Shell Sweden Limited |
Basic Design for Replacement of Existing Jet Fuel Tanks Nos 1,2& 3 with New Tanks At Islamabad Airport |
Shell Sweden Limited |
Basic Design of Bitumen Receipt, Storage and Loading Facility at DP Installation-Keamari |
Shell Sweden Limited |
Design and Detailed Engineering of Bulk Oil (Bitumen, HFO, Mogas & Gasoil) Storage Terminal at Thilawa Port Region-Myanmar |
National Infrastructure Holdings Co. Ltd. |
Design Vet and Basic Design of Bulk Oil Storage Terminal at Bhakkar |
Elite Engineering (PVt.) Ltd. |
Surge Protection System At Chaklala, Machike Installation & Tarujabba Depot |
Shell Sweden Limited |
Upgradation of Existing Pump House At DP Installation Keamari |
Shell Sweden Limited |
Design and Detailed Engineering for the Conversion and Installation of V-Power at Machike Installation |
Shell Sweden Limited |
Upgradation of Tanker Discharge Pipelines (TDL) Dia. 8" & Dia. 16" |
Shell Sweden Limited |
Design and Detailed Engineering of Bulk Oil Storage Terminal at Sahiwal |
Euro Oil (Pvt.) Ltd. |
Design Vet Consultant for the Bulk Oil Storage Terminal at Humriya-Sharjah. |
Arzoo International |
Design and Detailed Engineering of Bulk Oil Storage Depot at Daulatpur |
Laguardia Group of Companies |
Design and Detailed Engineering of LPG Storage and Loading Installation at Port Qasim-Karachi |
Indus Refinery Ltd. |
Design and Detailed Engineering of Bulk Oil Storage Terminal at Sahiwal |
The Fuelers (Pvt.) Ltd. |